Re:       PORT FAIRY & KOROIT GAS CONSTRUCTION PROJECT

 Rarely, in my more than 25 years as an engineer in the construction industry, have I had occasion to write a letter of acknowledgement to a subcontractor regarding the performance of their crew prior to the subcontracted works for the entire project being completed on site.

However, following your construction works at Koroit and as your work on the 110mm gas main construction stage in Port Fairy draws to a close, it is appropriate that special attention be made of:

·         Peter Cobb
·         Jamie Sullivan
·         Daniel Wright,
·         and Josh Green

working under the supervision of your Tony McElroy.  In sometimes quite trying conditions, the performance of this crew to date has been most commendable and their professionalism, work ethic and conduct on site is a credit to your organisation.

I trust you will see fit to ensure that each of the above is advised of this letter and I look forward to their continued involvement for the duration of the project.

As further crew are to be appointed to this project in the near future, I am hoping that you will select field staff of similar calibre in order to maintain the standard which Tony McElroy has now set and which I am confident to use as a benchmark for others.

Yours sincerely,
A. Holden.
Project Manager, Abi Group

GAS MAINS AND SERVICES

Draper's Civil Contracting Pty Ltd has the resources to construct gas services to domestic and industrial properties. We also construct gas mains in new sub-divisions and perform mains replacement work including large diameter Poly pipelines to 180mm dia.

Completed Projects

  • 2008/2009 Highton Gas Renewal
    13km gas mains renewals to Highon area.
    900 house reconnections to high pressure system.
  • Reticulation Gas Supply – Greenfield’s Estates
    10.0–15.0km of 63mm, 110mm and 180mm PE and Steel as supply and reticulation mains to Greenfield’s Estates in Geelong, Warrnambool, Portland, Cobden and the Bellarine Peninsula.
  • 2008 Elliminyt
    4,500 km 125mm HDPE supply main.
    14,000 km 63mm HDPE reticulation.
  • 2007 Cobden to Camperdown Supply Main
    19 km 160mm HDPE supply main.
  • 2007 Newcomb Mains Renewal
    7 km gas mains replacements.
    580 house connections.
  • 2007 Grovedale Mains Renewal
    4 km gas mains replacements.
    350 house connections.
  • Port Fairy
    Reticulation of existing township works including contract of approximately 2.0km of 110mm dia HDPE and 16.0km of 63mm dia HDPE.
  • Loch Avenue Werribee Reinforcement
    700m 180mm poly up grade with double steel tie ins completed on time.
  • Kororoit Creek Crossing Caroline Springs Reinforcement
    365m 200mm steel in extreme conditions completed on time to ovoid supply problems.
  • Service Laying – Existing Housing developments
    Provision of domestic supplies to residential developments within the City of Greater Geelong and the Surf Coast Shire for AbiGroup / Tenix.
  • Bellarine Peninsula – Stage 2 rollout
    Approx. 2.0km of 63mm PE to service existing residential areas in St. Leonards and Indented Head.
  • Bairnsdale Gas – Origin Energy
    4.0km of 125mm PE supply main along McKean Street, Princes Highway, Bairnsdale as part of Origin Energies roll out of reticulation gas supply to the Bairnsdale Township.
  • Gas Supply Main from Waurn Ponds to Torquay - Client: Westar.
    Civil work included the welding (butt and electro-fusion) and installation of approximately 15.0km of 180mm diameter HDPE pipe.